39" Erecting Post with Lifeline Pass Through

Part Number 1965-145B

This post provides a 100% tie-off point during the building erection phase. It's innovative design eliminates the need to disconnect from a lifeline, but allows it to pass through the top of the post to easily relocate.

Cable, turn buckles and crosby clamps to be supplied by others.



Calculate Your Savings
calculate


Calculate Bonus Savings on Debris
Netting Installation-Removal
calculate